Understanding the Supply Chain
True/False
1. A supply chain includes only the organizations directly involved in supplying
components needed for manufacturing.
Answer: False
Difficulty: Moderate
2. A supply chain consists of all parties involved, directly or indirectly, in fulfilling a
customer request.
Answer: True
Difficulty: Moderate
3. A supply chain could be more accurately described as a supply network or
supply web.
Answer: True
Difficulty: Moderate
4. The objective of every supply chain is to maximize the overall value generated.
Answer: True
Difficulty: Easy
5. The objective of every supply chain is to maximize the value generated for the
manufacturing component of the supply chain.
Answer: False
Difficulty: Moderate
6. Every supply chain must include all 5 stages.
Answer: False
Difficulty: Easy
7. The cycle view of a supply chain holds that the processes in a supply chain are
divided into a series of activities performed at the interface between successive
stages.
Answer: True
Difficulty: Moderate
8. The cycle view of a supply chain holds that the processes in a supply chain are
divided into 2 categories depending on whether they are initiated in response to
or in anticipation of customer orders.
Answer: False
Difficulty: Moderate
9. The push/pull view of a supply chain holds that the processes in a supply chain
are divided into 2 categories depending on whether they are initiated in response
to or in anticipation of customer orders.
Answer: True
Difficulty: Easy
10. The push/pull view of a supply chain holds that the processes in a supply chain
are divided into a series of activities performed at the interface between
successive stages.
Answer: False
Difficulty: Easy
11. The objective of the customer arrival process is to maximize the conversion of
customer arrivals to customer orders.
Answer: True
Difficulty: Moderate
12. The objective of the customer arrival process is to ensure that orders are quickly
and accurately entered and communicated to other affected supply chain
processes.
Answer: False
Difficulty: Moderate
13. The objective of customer order entry is to ensure that orders are quickly and
accurately entered and communicated to other affected supply chain processes.
Answer: True
Difficulty: Moderate
14. The objective of customer order entry is to maintain a record of product receipt
and complete payment.
Answer: False
Difficulty: Hard
15. The replenishment cycle occurs at the retailer/distributor interface.
Answer: True
Difficulty: Hard
16. The replenishment cycle occurs at the distributor/manufacturer interface.
Answer: False
Difficulty: Hard
17. The replenishment cycle is initiated when a supermarket runs out of stock of
a
partic
ular item.
Answer: True
Difficulty: Hard
18. The replenishment cycle is initiated when customers load items intended for
purchase into their carts.
Answer: False
Difficulty: Hard
19. The manufacturing cycle occurs at the distributor/manufacturer interface.
Answer: True
Difficulty: Moderate
20. The manufacturing cycle occurs at the manufacturer/supplier interface.
Answer: False
Difficulty: Moderate
21. The production scheduling process in the manufacturing cycle is similar to the
order entry process in the replenishment cycle.
Answer: True
Difficulty: Hard
22. The production scheduling process in the manufacturing cycle is similar to the
order fulfillment process in the replenishment cycle.
Answer: False
Difficulty: Hard
23. The procurement cycle occurs at the manufacturer/supplier interface.
Answer: True
Difficulty: Easy
24. The procurement cycle occurs at the retailer/distributor interface.
Answer: False
Difficulty: Easy
25. The cycle view of the supply chain is useful when considering operational
decisions, because it specifies the roles and responsibilities of each member of
the supply chain.
Answer: True
Difficulty: Moderate
26. The cycle view of the supply chain is useful when considering operational
decisions, because it categorizes processes based on whether they are initiated
in response to or in anticipation of customer orders.
Answer: False
Difficulty: Moderate
27. The push/pull view of the supply chain is useful when considering strategic
decisions relating to supply chain design, because it categorizes processes
based on whether they are initiated in response to or in anticipation of customer
orders.
Answer: True
Difficulty: Moderate
28. The push/pull view of the supply chain is useful when considering strategic
decisions relating to supply chain design, because it specifies the roles and
responsibilities of each member of the supply chain.
Answer: False
Difficulty: Moderate
29. Pull processes may also be referred to as reactive processes.
Answer: True
Difficulty: Easy
30. Pull processes may also be referred to as speculative processes.
Answer: False
Difficulty: Easy
31. Push processes may also be referred to as speculative processes.
Answer: True
Difficulty: Easy
32. Push processes may also be referred to as reactive processes.
Answer: False
Difficulty: Easy
33. All supply chain activities within a firm belong to one of three macro processes –
CRM, ISCM and SRM.
Answer: True
Difficulty: Easy
34. There is a close connection between the design and management of supply
chain flows and the success of a supply chain.
Answer: True
Difficulty: Easy
Multiple Choice
1. Which of the following is not a stage within a typical suppl
y chain?
a. Cu
stomers
b. Retailers
c. Wholesalers/Distributors
d. Manufacturers
e. All of the above are stages within a typical supply chain.
Answer: e
Difficulty: Easy
2. Which of the following is not a stage within a typical supply chain?
a. Customers
b. Retailers
c. Wholesalers/Distributors
d. Merchandisers
e. Component/Raw material suppliers
Answer: d
Difficulty: Easy
3. Supply chain profitability is
a. not correlated to the value generated by the various stages of the supply
chain.
b. the total profit to be shared across all supply chain stages.
c. the difference between the revenue generated from the customer and the
overall cost across the supply chain.
d. the total revenue generated by the distributor stage of the supply chain.
e. b and c only
Answer: e
Difficulty: Difficult
4. Successful supply chain management requires which of the following decision
phases?
a. supply chain strategy/design
b. supply chain planning
c. supply chain operation
d. all of the above
e. a and b only
Answer: d
Difficulty: Moderate
5. The decision phases in a supply chain include
a. production scheduling.
b. customer relationship management.
c. supply chain operation.
d. supply chain orientation.
e. all of the above
Answer: c
Difficulty: Moderate
6. The cycle view of a supply chain holds that
a. the processes in a supply chain are divided into 2 categories.
b. the processes in a supply chain are divided into a series of activities
performed at the interface between successive stages.
c. all processes in a supply chain are initiated in response to a customer
order.
d. all processes in a supply chain are performed in anticipation of customer
orders.
e. None of the above are true.
Answer: b
Difficulty: Moderate
7. The push/pull view of a supply chain holds that
a. the processes in a supply chain are divided into a series of activities
performed at the interface between successive stages.
b. all processes in a supply chain are initiated in response to a customer
order.
c. all response in a supply chain are performed in anticipation of customer
orders. d. the processes in a supply chain are divided into 2 categories depending
on whether they are initiated in response to or in anticipation of customer
orders.
e. None of the above are true.
Answer: d
Difficulty: Moderate
8. Which of the following is not a cycle in the supply chain cycle view?
a. Analysis cycle
b. Customer order cycle
c. Replenishment cycle
d. Manufacturing cycle
e. Procurement cycle
Answer: a
Difficulty: Moderate
9. Which of the following is not a cycle in the supply chain cycle view?
a. Customer order cycle
b. Replenishment cycle
c. Manufacturing cycle
d. Procurement cycle
e. All of the above are par
t of the supply chain cycle view.
Answer: e
Difficu
lty: Moderate
10. The customer order cycle occurs at the
a. customer/retailer interface.
b. retailer/distributor interface.
c. distributor/manufacturer interface.
d. manufacturer/supplier interface.
e. none of the above
Answer: a
Difficulty: Easy
11. Which of the following is not a process in the customer order cycle?
a. Customer arrival
b. Customer qualification
c. Customer order entry
d. Customer order fulfillment
e. Customer order receiving
Answer: b
Difficulty: Moderate
12. Customer arrival refers to
a. the point in time when the customer has access to choices and makes a
decision regarding a purchase.
b. the customer informing the retailer of what they want to purchase and the
retailer allocating product to the customer.
c. the process where product is prepared and sent to the customer.
d. the process where the customer receives the product and takes
ownership. e. none of the above
Answer: a
Difficulty: Moderate
13. The objective of the customer arrival process is to
a. get the correct orders to customers by the promised due date at the
lowest possible cost.
b. maintain a record of product receipt and complete payment.
c. maximize the conversion of customer arrivals to customer orders.
d. ensure that orders are quickly and accurately entered and communicated
to other affected supply chain processes.
e. none of the above
Answer: c
Difficulty: Easy
14. Customer order entry is
a. the point in time when the customer has access to choices and makes a
decision regarding a purchase.
b. the customer informing the retailer of what they want to purchase and the
retailer allocating product to the customer.
c. the process where product is prepared and sent to the customer.
d. the process where the customer receives the product and takes
ownership.
e. none of the above
Answer: b
Difficulty: Moderate
15. The objective of customer order entry is to
a. get the correct orders to customers by the promised due date at the
lowest possible cost.
b. maintain a record of product receipt and complete payment.
c. maximize the conversion of customer arrivals to customer orders.
d. ensure that orders are quickly and accurately entered and communicated
to other affected supply chain processes.
e. none of the above
Answer: d
Difficulty: Easy
16. Customer order fulfillment refers to
a. the point in time when the customer has access to choices and makes a
decision regarding a purchase.
b. the customer informing the retailer of what they want to purchase and the
retailer allocating product to the customer.
c. the process where product is prepared and sent to the customer.
d. the process where the customer receives the product and takes
ownership.
e. none
of the above
Answer: c
Difficulty: Moderate
17. The objective of customer order fulf
illment is to
a. get the correct orders to customers by the promised due date at the
lowest possible cost.
b. maintain a record of product receipt and complete payment.
c. maximize the conversion of customer arrivals to customer orders.
d. ensure that orders are quickly and accurately entered and communicated
to other affected supply chain processes.
e. none of the above
Answer: a
Difficulty: Easy
18. Customer order receiving is
a. the point in time when the customer has access to choices and makes a
decision regarding a purchase.
b. the customer informing the retailer of what they want to purchase and the
retailer allocates product to the customer.
c. the process where product is prepared and sent to the customer.
d. the process where the customer receives the product and takes
ownership.
e. none of the above
Answer: d
Difficulty: Moderate
19. The replenishment cycle occurs at the
a. customer/retailer interface.
b. retailer/distributor interface.
c. distributor/manufacturer interface.
d. manufacturer/supplier interface.
e. none of the above
Answer: b
Difficulty: Easy
20. The processes involved in the replenishment cycle include
a. retail order receiving.
b. retail order entry.
c. retail order trigger.
d. retail order fulfillment.
e. all of the above
Answer: e
Difficulty: Moderate
21. The processes included in the replenishment cycle include all of the following
except
a. retail order receiving.
b. retail order entry.
c. retail order trigger.
d. retail order fulfillment.
e. none of the above
Answer: e
Difficulty: Moderate
22. The processes included in the replenishment cycle include
a. order arrival.
b. production scheduling.
c. retail trigger.
d. manufacturing.
e. receiving.
Answer: c
Difficulty: Moderate
23. The replenishment cycle is initiated when
a. the customer walks into the supermarket.
b. the customer calls a mail order telemarketing center.
c. customers load items intended for purchase into their carts.
d. a supermarket runs out of stock of a particular item.
e. a product is received into stock at a store.
Answer: d
Difficulty: Hard
24. The manufacturing cycle occurs at the
a. customer/retailer interface.
b. retailer/distributor interface.
c. distributor/manufacturer interface.
d. manufacturer/supplier interface.
e. none of the above
Answer: c
Difficulty: Easy
25. The processes involved in the manufacturing cycle include
a. receiving.
b. manufacturing and shipping.
c. production scheduling.
d. order arrival.
e. all of the above
Answer: e
Difficulty: Moderate
26. The processes involved in the manufacturing cycle include
a. order trigger.
b
. production scheduling.
c. order fulfillment.
d. order entry.
e. manufacturing order analysis.
Answer: b
Difficulty
: Moderate
27. The production scheduling process in the manufacturing cycle is similar to the
a. order receiving process in the replenishment cycle.
b. order fulfillment process in the replenishment cycle.
c. order entry process in the replenishment cycle.
d. order trigger process in the replenishment cycle.
e. none of the above Answer: c
Difficulty: Hard
28. The manufacturing and shipping process in the manufacturing cycle is equivalent
to the
a. order receiving process in the replenishment cycle.
b. order fulfillment process in the replenishment cycle.
c. order entry process in the replenishment cycle.
d. order trigger process in the replenishment cycle.
e. none of the above
Answer: b
Difficulty: Hard
29. The procurement cycle occurs at the
a. customer/retailer interface.
b. retailer/distributor interface.
c. distributor/manufacturer interface.
d. manufacturer/supplier interface.
e. none of the above
Answer: d
Difficulty: Easy
30. The relationship between the manufacturer and supplier during the procurement
cycle is very similar to the relationship between
a. customer and retailer.
b. retailer and distributor.
c. retailer and manufacturer.
d. distributor and manufacturer.
e. manufacturer and customer.
Answer: d
Difficulty: Moderate
31. The cycle view of the supply chain is useful when considering operational
decisions, because
a. it categorizes processes based on whether they are initiated in response
to or in anticipation of customer orders.
b. it specifies the roles and responsibilities of each member of the supply
chain.
c. processes are identified as either reactive or speculative.
d. it focuses on processes that are external to the firm.
e. it focuses on processes that are internal to the firm.
Answer: b
Difficulty: Hard
32. The push/pull view of the supply chain is useful when considering strategic
decisions relating to supply chain design, because
a. it categorizes processes based on whether they are initiated in response
to or in anticipation of customer orders.
b. it specifies the roles and responsibilities of each member of the supply
chain.
c. it clearly defines the processes involved and the owners of each process. d. it focuses on processes that are external to the firm.
e. it focuses on processes that are internal to the firm.
Answer: a
Difficulty: Hard
33. Which of the following statements about pull processes is accurate?
a. May also be referred to as speculative processes.
b. Execution is initiated in anticipation of customer orders.
c. At the time of execution, demand must be forecast.
d. May also be referred to as reactive processes.
e. None of the above
are accurate.
Answer: d
Difficulty: Easy
34. Which of the following is not an accurate statement about pull processes?
a. May also be referred to as specu
lative processes.
b. Execution is initiated in response to a customer order.
c. At the time of execution, demand is known with certainty.
d. May also be referred to as reactive processes.
e. All of the above are accurate.
Answer: a
Difficulty: Easy
35. Which of the following statements about push processes is accurate?
a. May also be referred to as speculative processes.
b. Execution is initiated in response to customer orders.
c. At the time of execution, demand is known with certainty.
d. May also be referred to as reactive processes.
e. None of the above are accurate.
Answer: a
Difficulty: Easy
36. Which of the following is not an accurate statement about push processes?
a. May also be referred to as speculative processes.
b. Execution is initiated in anticipation of customer orders.
c. At the time of execution, demand must be forecast.
d. May also be referred to as reactive processes.
e. All of the above are accurate.
Answer: d
Difficulty: Easy
37. Supply chain macro processes include which of the following?
a. Customer Relationship Management (CRM)
b. Internal Supply Chain Management (ISCM)
c. Supplier Relationship Management (SRM)
d. all of the above
e. none of the above
Answer: d
Difficulty: Easy
38. Supply chain macro processes include which of the following? a. Internal Relationship Management (IRM)
b. Customer Relationship Management (CRM)
c. External Relationship Management (ERM)
d. Supply Chain Relationship Management (SCRM)
e. none of the above
Answer: b
Difficulty: Moderate
39. Supply chain macro processes include which of the following?
a. Internal Relationship Management (IRM)
b. External Relationship Management (ERM)
c. Supplier Relationship Management (SRM)
d. Supply Chain Relationship Management (SCRM)
e. none of the above
Answer: c
Difficulty: Moderate
40. Activities involved in the Customer Relationship Management (CRM) macro
process include
a. planning of internal production and storage.
b. order fulfillment.
c. marketing.
d. supply planning.
e. demand planning.
Answer: c
Difficulty: Hard
41. Activities involved in the Customer Relationship Management (CRM) macro
process include all of the following except
a. demand planning.
b. marketing.
c. sales.
d. order management.
e. call center management.
Answer: a
Difficulty: Hard
42. Activities involved in the Internal Supply Chain Management (ISCM) macro
process include
a. marketing.
b. order fulfillment.
c. sales.
d. order management.
e. call center management.
Answer: b
Difficulty: Hard
43. Activities involved in the Internal
Supply Chain Management (ISCM) macro
process include all of the following except
a. planning of internal production and storage.
b. order fulfillment. c. supply planning.
d. demand planning.
e. order management.
Answer: e
Difficulty: Hard
44. Activities involved in the Supplier Relationship Management (SRM) macro
process include
a. planning of internal production and storage.
b. order fulfillment.
c. supply planning.
d. supplier evaluation and selection.
e. order management.
Answer: d
Difficulty: Moderate
45. Activities involved in the Supplier Relationship Management (SRM) macro
process include all of the following except
a. negotiation of supply terms.
b. design collaboration.
c. supply planning.
d. supplier evaluation and selection.
e. supply collaboration.
Answer: c
Difficulty: Hard
46. The phenomenal success of 7-Eleven Japan is attributed to
a. being in the right place at the right time.
b. its supply chain design and management ability.
c. having 9000 locations.
d. serving fresh food.
e. none of the above
Answer: b
Difficulty: Moderate
47. A key issue facing Toyota is
a. developing an internet marketing system.
b. whether to specialize in a particular market.
c. design of its global production and distribution network.
d. how to implement model changes.
e. all of the above
Answer: c
Difficulty: Hard
Essay/Problems
1. Explain the 3 decision phases (categories) that must be made in a successful
supply chain.
Answer: The 3 decision phases that occur within a supply chain are supply chain
strategy (or design), supply chain planning and supply chain operation. Decisions
relate to the flow of information, product and funds. The difference between
categories depends upon the frequency of each decision and the time frame over
which it has an impact. During the supply chain strategy phase, a company
determines what the chain’s configurations will be, how resources will be
allocated, and what processes each stage will perform. This will establish the
structure of the supply chain for several years. Supply chain planning deals with
decisions with a time frame from 3 months up to a year. The planning phase
must work within the constraints established in the strategy phase. Planning
decisions include which markets to supply from which locations, subcontracting
of manufacturing, inventory policies and timing and size of marketing promotions.
The supply chain operation phase operates on a weekly or daily time horizon and
deals with decisions concerning individual customer orders.
Difficulty: Hard
2. Describe the cycle view of the processes within a supply chain.
Answer: The cycle view divides the supply chain into a series of 4 cycles
between the 5 different stages of a supply chain. The cycles
are the customer
order cycle, replenishment cycle, manufacturing cycle and procurement cycle.
The customer order cycle occurs at the customer/retailer interface and includes
all processes directly involved in receiving and fill
ing the customer. The
replenishment cycle occurs at the retailer/distributor interface and includes all
processes involved in replenishing retailer inventory. The manufacturing cycle
typically occurs at the distributor/manufacturer (or retailer/manufacturer) interface
and includes all processes involved in replenishing distributor (or retailer)
inventory. The procurement cycle occurs at the manufacturer/supplier interface
and includes all processes necessary to ensure that the materials are available
for manufacturing according to schedule.
Difficulty: Moderate
3. Explain the push/pull view of the processes within a supply chain.
Answer: The push/pull view of the supply chain divides supply chain processes
into two categories based on whether they are executed in response to a
customer order or in anticipation of customer orders. Pull processes are initiated
in response to a customer order. Push processes are initiated and performed in
anticipation of customer orders. The push/pull boundary separates push
processes from pull processes. This view is very useful when considering
strategic decisions relating to supply chain design, because it forces a more
global consideration of supply chain processes as they relate to the customer.
Difficulty: Moderate
4. Explain the three macro processes within a supply chain.
Answer: All processes within a supply chain can be classified into three macro
processes which are Customer Relationship Management (CRM), Internal
Supply Chain Management (ISCM), and Supplier Relationship Management
(SRM). Customer Relationship Management (CRM) includes all processes that focus on the interface between the firm and its customers such as marketing,
sales, call center management and order management. Internal Supply Chain
Management (ISCM) includes all processes that are internal to the firm such as
preparation of demand and supply plans, preparation of inventory management
policies, order fulfillment and planning of capacity. Supplier Relationship
Management (SRM) includes all processes that focus on the interface between a
firm and its suppliers such as evaluation and selection of suppliers, negotiation of
supply terms and communication regarding new products and orders.
Difficulty: Moderate
5. Explain why supply chain flows are important.
Answer: Supply chain flows are important, because there is a close connection
between the design and management of supply chain flows (product, information,
and cash) and the success of a supply chain. The success of many companies
can be directly traced to the design and management of
an appropriate supply
chain. The failure of many businesses can be linked directly to their inability to
effectively design and manage supply chain flows.
Difficulty: Moderate