电气工程师的英文简历模板

玛丽莲梦兔
955次浏览
2020年08月04日 16:48
最佳经验
本文由作者推荐

台湾辅仁大学-山东二本院校排名


电气工程师的英文简历模板

Name:
Mr. B
Nationality:
China (Mainland)


Current Place:
Guangzhou
HeightWeight:
174 cm 65 kg


Marital Status:
married
Age:
33 years








Career Objective






Application type:
Jobseeker


Preferred job title:


Elecrical EngineerTechnician: electrical engineer 、
Mechatronics Engineer.: 、 Automation Control
EngineerTechnician:


Working life:
8
Title:
primary title


Job type:
Full time
Expected Start date:
In a day


Expected salary:


¥8,000~¥9,999
Preferred working place:
Guangzhou Foshan Shenzhen






Work experience










Company
****CO., Limited Begin and end date: 2012-
06-2013-11


Enterprise nature:
State-owned enterprisesIndustry:
MechanicsElectrical EquipmentHeavy Industry


Job Title:
Electrical engineer


Job description:


1)Travelling to factory with shipping equipment,
installing and commissioning the equipment, give customer
operate and maintenance training.

2)Supply spare parts after sales, ensure the
customer equipment have minimum down time.

3)my main responsible on CT driver and servo
motor , PLC and security current circuit, other related mechanical
and pneumatic parts 。

4) Electrical circuit maintenance and sensor
inspection. Including optical switch, magnet switch, touch
proximity switch, infrared sensor, encoder, safety lock, sound and
light horn, pressure gauge, measurement gauge, thermal couple,
emergency circuit maintenance.

5)Resolve fault of Servo motor , fix all problem
about inverter and other electrical equipment


6) Positioning device, put on power cable and
communication wire, connecting wire, grounding and test, power
on.

7)Adjust level of equipment, initial program and
parameter, setting new parameter according to process. Keep our
equipment continuous running when production coming.
Equipment including stacker, transfer ,ITD and cross conveyor and
pushbar, spray bridge.

8)Relay circuit fault check, and resolve it,
including hydraulic switch ,flowmeter and plunger pump.

9)UPS power supply maintenance, ensure
equipment running without shutting down.

10)work with equipment including :

1,SIEMENS step 7- 300 and 400


2,SIEMENS wccflex 2008

3,CT drive SP series and SK series

4,thermocouple

5,instrument for calculate pressure or flow

6,motor,servo motor.

7,relay,safety relay

11)my boss service manager is UK person


Reasons for leaving:


Company
****CO., Limited Begin and end date: 2009-
04-2012-06


Enterprise nature:
Soly foreign funded enterprisesIndustry:
MechanicsElectrical EquipmentHeavy Industry


Job Title:
Electrical engineer


Job description:
1)Respect of commissioning and installation of
glass production line, coordinary with customer to solver various
technology issue and working team arrange.


2)Communication with oversea expert to receive
relate technical information and complete installation and debug.

3)Confirm schedule of the project installation
following the planning on the contract. Arrange installation people
to complete job step by step, resolve every urgently problem on
site.

4)Debug every machine and set up the automatic
line

5)training the staff of factory to operate and
maintenance the gauge.

6)Solved the problem of electrical control circuit.

7)Communication with sales staff for production
basical case, I can dispose related software and hardware.

8) inspect control system, and solve problem



9) supply technology direction

10)complete electrical debug

11)coordinate between corporation and client

12)maintains and replace the brake of motor.

13) Configure profibus network, communication
between CUP and IO module, and other ystem, including
Ethernet and profibus-DP control network, MPI connecting.

14)Maintenance inverters(CT),maintenance
motor with encoder, motor capacity from 4kw to 40 kw.

15)Electrical circuit maintenance and sensor
inspection. Including optical switch, magnet switch, touch


proximity switch, infrared sensor, encoder, safety lock, sound and
light horn, pressure gauge, measurement gauge, thermal couple

16)Robot package maintenance, 6 axis servo
motors, backoff programmer, resolve any fault an problem, make
sure production no stop. Daily equipment maintenance.

17)my boss project manager is Italy person


Reasons for leaving:


Company
****CO., Limited Begin and end date: 2005-
07-2009-04


Enterprise nature:


Soly foreign funded enterprisesIndustry:
CommunicationTelecomNetwork Equipment


Job Title:
electrical engineer


Job description:
july 2005 to April 2009----furnace electrical
engineer

1)Establish standard job sheet of instrument
facility,establish item of maintenance,mission arrangement

2)Following specialist debug instrument
equipment,then gave a training to other colleague.

3)In charge of purchase application,acceptance
and managemen of equipment.



4)In charge of defect examining,improving
step,improving tracking.

5)Resolving accident trouble of produce and
recording the report.

6)Administrate document following the standard
of ISO9000.

7)In charge of course of 5S activity.

8)Contact specialist,argue technology difficulty..

9)In charge of maintence of software and
hardware about Siemence PLC,improve control program.

10)Manage daily work in furnace,standard job
sheet,polishing environment, purchase, project,solve emergency,
maintence.



11)Being familiar with several sensor,proportion
valve,electromagnetic valve.


Reasons for leaving:
make progress










Educational Background







Name of School:
wuhan univercity of technology and science


Highest Degree:
Bachelor
Date of Graduation:
2005-07-01


Name of Major 1:
automation
Name of Major 2:




Education experience:




Start date
End date
Education organization
Majors
Certificate
Certificate No


2005-10
2005-10
guangzhou training centre of simence


PLC










Language Ability






Foreign Language:
English
Level:
perfect


Chinese level:
perfect
Cantonese Level:
normal






Relevant skills and abilities







Personer ability

well siemens S7300400 programe,applying
LADCFCSTL wonderfully.

family with S7300400 hardware configuration and
profibus.

configuration software(e.g wondware of intouch).

electrical control circuit,solve problem quickly.

several transducer(e.g optical sensorproximity
swithpresure swithpresure transmitterthomercouple)



tand electrical drawing.

ince equipment.






Self- recommendation letter







Open,actively.

i have work in electrical for 8 years,i am available to
responsible for industry company engineer position.



project experience

1,2005, ** Company ,annually two million tons of steel
production furnace installation,at first I am responsible for
supervision basement lighting project, electrical panel mounted
supervision, pull wiring supervision. Later I am responsible for
profibus bus connection with foreign technicians, industrial
ethernet connection, I O check, cold tes. installation time spend
three months, then one month for hot commissioning, after
project complete, I am responsible for routine maintenance work.
Main configuration device: 10kv transformer and high voltage
control cabinet, ABB vacuum circuit breakers, low voltage control
cabinet, S7-400 control PLC. (note:Due to confidentiality
considerations, hidden some information)







2,2011, ** Company, five cold end solar glass production
line, I am responsible for control cabinet installation, wiring
supervision, personally responsible for the PLC basic program
downloading, hardware configuration, profibus bus connection via
Industrial Ethernet , I O point test, and then follow the hot
commissioning with foreign technicians, project time is four
months. Additional four months stay in factory to help
maintainance. Main configuration: S7-300PLC, ** inverter, encoder
**, ** servo motors, software class intouch, winccflex, beckoff
PLC. two same project for different cusotmer. (Due to
confidentiality considerations, hidden some information)



3, 2012, Kuala Lumpur, Malaysia ,** company, hot end of
a glass container handling system, I am responsible for the hot


end conveyor equipment installation and commissioning,
mechanical part and electrical workare done by myself only,
project schedule is within two weeks, the main configurations: * *
Drive ** servo motors, conveying equipment. 4 Similar projects.
(Due to confidentiality considerations, hidden some information)

吸血鬼日记结局-安徽职业技术学院地址


世界人权日-江苏省国税局


云南建设厅-无线互联网


增资扩股协议-出国留学签证


山东高考体育-工作证明信


恩施人事网-英语培训心得


关于祖国的资料-元旦晚会作文


花木兰观后感-河南省国家税务局