买卖合同(中英文对照)(2020版)

别妄想泡我
680次浏览
2020年08月08日 20:29
最佳经验
本文由作者推荐

计划生育依法行政-语文教师述职报告



1.售货合同(sales contract)
编号 No.
日期 Date:
买方:
The Buyers:
电报: 传真:
Cable: FAX
卖方:
The Sellers:
电报: 电传: 传真:
Cable: Telex: FAX
本合同由买卖双方订立,根据本合同规定的条款,买方同意购买,卖方同意出售下述商品:
This Contract is made by and between the Buyers and Sellers ,whereby the Buyers agree to buy
and the Sellers agree to sell the undermentioned commodity according to the term and conditions
stipulated below.
(1) 货名及规格
COMMODITY AND SPECIFICATIONS



(2)数量

(3)单价

(4)总价

(5)生产国别和制造厂商:COUNTRY OF ORIGIN AND MANUFACTURERS:
(6)装运期限:TIME OF SHIPMENT:
(7)装运口岸:PORT OF SHIPMENT:
(8)到货口岸:PORT OF DESTINGATION:
(9)保 险:INSURANCE:
由买方投保。
To be coverd by the Buyers.
(10)包装:PACKING:
须用坚固的新木箱纸箱包装,适合长途海运,防湿、防潮、 防震、防锈,而粗暴搬运。
由于包装不良所发生的损失,由于采用不充分或不妥善的防护措施而造成的任 何锈损,卖方
应负担由此而产生的一切费用和或损失。
To be packed in new strong woden case (s) carton (s) suitable for long distance ocean
transportation and well protected against dampenss, moisture, shock, rust and rough handling. The
Sellers shall be liable for any damage to the goods on account of improper packing and for any
rust damage attributable to inadequate or improper protective measures taken by the Sellers, and
insuch case or cases any and all losses andor expenses incurred in consequence thereof shall be
borne by the Sellers.
(11) 唛 头:SHIPPING MARK:
卖 方应在每件包装上,用不褪色油墨清楚地标刷件号、尺码、毛重、净重、“此端向上”、
“小心轻放”“ 切勿受潮”等字样,并刷有下列唛头:
On the surfacee of each package, the package number ,measurements, gross weight, net
weight, the lifting positions, such cautions as “DO NOT STACK UP SIDE DOWN”,
“HANDLE WITH CARE”;“KEEP AWAY FROM MOISTURE”and the following
shiping mark shall be stenciled legibly in fadeless paint:



(12)付款条件:TERMS OF PAYMENT:
甲、信 用证付款°货物装运前一个月,买方应由上海中国银行开立以卖方为受益人的
不可撤销的信用证,凭本合 同第13条甲项规定的装运单据交到上海(银行)后付款。
乙、托收付款:货物装运后,卖方应将以买 方为付款人的汇票连同本合同第13条甲项
所列各种装运单据,通过卖方银行寄交买方银行即上海中国银 行转交买方,并托收货款。
丙、信汇付款:买方收到本合同第13条甲项所列单据后,应于 天内信汇祭款。
A. Payment by LC: One month before shipment, the Buyers shall establish with Bank of
China, Shanghai an Irrevocable LC in favour of the Sellers, to be available against presentation in
Shanghai of the shipping documents stipulated in Clause 13 hereof.
B. Payment by Collection: After delivery is made, the Sellers shall send through the Sellers,
bank draft drawn on the Buyers together with the shipping documents apecified in Clause 13
hereof, to the Buyers through the Buyers bank, the Bank of China, Shanghai, for collection.
C. Payment by MT: Payment to be effected by the Buyers not later than days after receipt
of the shipping documents specified in Clause 13 hereof.
(13)单 据:DOCUMENT:
甲、卖方应将下列单据提交付款银行议付货款托收付款,如为信汇付款,下列单据应
径寄买方:
1. 全套可议付的洁净已装运海运提单,空白抬头,空白背书。注明“运费到付”,并
通知到 货口岸中国对外贸易运运输公司。
2. 由包收据注明由费空运提单。
3.保险单或保险证 明书注明投保兵险,一切险包括TPND。破碎,渗漏。无百分比限制,
并注明货物到达后倘发现残破碎 ,渗漏。无百分比限制,并注明货物到达后倘发现残破碎,
渗漏。无百分比限制,并注明货物到达后倘发 现残损情况,须向到货口岸之中国商品检验局
申请检验。
4. 发票五份,注明合同号,唛头。
5.装箱单两份,注明毛、净重、尺码和所装货物每项的品名数量。
6.按照本合同第18条甲项规定由制造厂签发的质量和数量重量证明书及检验报告各两
份。
A. The Sellers shall present the following documents to the paying bank for
negotiationcollection, or to the Buyers in case of payment by MT.
1. Full set of Negotiable Clean on Board Ocean Bills of Lading marked “FREIGHT TO
COLLECT”and made out to order ,blank endorsed,and notifying the china National Foreign Trade
Transportation Corporation at the port of destination.
2. parcel post Receipt,indicating postageAir Way Bill
nce Policy or Certificate,covering War risk and all risks including TPND,Breakage
and Leakage irrespec-tive of percentage and indicating “In the event of loss or damage,request for
survey upon arrival of the cargo at the port of destination be made to the China Commodity
Inspection Bureau of that port”.
e in quintuplicate,indicating contract number and shipping mark.
g List in duplicate with indication of both gross and net weights,measurements and
quantity of each item packed.
icate of Quality and QuantityWeight and Testing Report,each in duplicate issued
by the manufacturers as specified in items of Clause 18 hereof.
7.A true copy of cable to advise the Buyers of shipment im-mediately the goods are loaded on ship



as specified in Clanus 15 hereof.
乙、货物装运后十天内,除上述装运通知电报副本外,卖方应另 外准备各种单据副本三套,
以空邮将其中一套寄交买方,另外两套寄交到货囗岸中国对外贸易运输公司。
b. Within 10 days afrer shipment is effected,the Sellers shall prepare three sets,each comprising
one copy each of the above mentioned documents with the exception of the cable shipping advice
one set to be airmailed to the Buyers and the other two Sets to the China National Foreign Trade
Transportation Corporation at the port of destination.
(14) 技术资料:TECHNICAL DOCUMENTS:
甲、每次发货进,卖方应将下述英文技术资料一整套与货物一起装箱,运交买方:
1. 基础图
2. 布线说明,电气及或气动及或液压接线图
3. 易损零件制造图
4. 零件目录
5. 本合同第18条甲项规定的品质证明书
6. 安装、操作和维修说明书
a. One complete set of the lollowing technical documents written in English shall be packed and
depatchde to-gether with each consignment:
1. Foundation drawings
2. Wiring instructions,diagrams of electrical connections andof pneumatic andor hydraulic
connections
3. Manufacturing drawings of easily worn parts
parts catalogues
icate of quality as stipulated in Item a of Clause 18 hereof
on,operation, service and repair instruction books
乙、N个月前,卖方应将本条甲项所列1.2.3.4.5.6.各种技术资料2套,以空邮寄交买方。
b. months before shipment ,the Sellers shall air-mail to the Buyers two complete sets of the
technical documents mentioned in points 1,2,3,4,5and 6 under items of this Clause.
(F.U.M.P)
(15)装运条款:TERMS OF SHIPMENT:
甲、每次 发货如毛重超过两公吨,卖方应于本合同第8条规定的装运期六十天前,将合同编
号、商品名称、数量、 价值、件数、毛重、尺码以及及货物在装货口岸备舀日期函电告买
方,以便买方订舱。如毛重不超过两公 吨,则卖方应与装货口岸的买方超前享受运代理人直
接联系装运事宜。
a. For each shipment exceeding two metric tons in gross weight, the Sellers shall, 60 days before
the date of shipment stipulated in Clause 8 hereof, advise the buyers by cableletter of the contract
number name of commodity, quantity, value, number of packages, gross weight and measurements
and date of readiness at the port of shipment in order for the buyers to book shipping space. For
each shipment not over two metric tons in gross weight, the Sellers shall get in direct touch with
the buyers shipping agent at the loading port.
乙、每发货毛重超过两公吨时,其订舱事宜将由买方装运代理人北京中国 租船公司(电报挂
号:ZHONGZU BEIJING)办理,买方与该公司密切联系有关装运事宜。 卖方则应与在装
货口岸的中国租船公司装运代理人密切联系。
b. Booking of shipping space for each shipment exceeding two metric tons in gross weight will be
attended to by the buyers shipping agent, China National Chartering Corporation, Beijing, China



(Cable Address: ZHONGZU BEIJNG) with whom the Buyers shall keep in close contact in the
matter of shipment. The Sellers shall keep in close contact with ZHONGZU’S shipping agent at
the loading port.
丙、北京中国租船公司或其港口代理人于估计承运船到 达装货口岸日期十天以前,将船名、
预计装船日期、合同编号初步通知卖方,以便卖方安排装运。事先指 定的承运船如有变更,
或其估计到达日期提前或延期时,买方或其装运代理人应及时通知卖方,如果该船 未能于买
方或其装运代理人所通知的到达日期后三十天内到达装运口岸,则从第三十一天起货物的仓租和火灾保险费用应由买方负担。
c. China National Chartering Corporation, Beijing, China, or their shipping agent at the loading
port, will send the Sellers, 10 days before the estimated date of arrival of the carrying vessel at the
port of shipment a preliminary notice indicating the name of vessel, estimated date of loading,
contract number in order for the Sellers to arrange shipment. In case the carrying vessel previously
designated is to be replaced by another vessel or in case the estimated date of arrival of the
carrying vessel is to be advanced or postponed, the Buyers or their shipping agent shall advise the
Sellers to that effect in time. Should the vessel fail to arrive at the port of loading within 30 days
after the arrival date advised by the buyers or their shipping agent, the buyers shall bear the
storage and fire insurance expenses incurred from the 31st day.
丁、承运船及时到达装货口岸时,如卖方未将货物备妥待装,因此而发生的空舱费和延滞费< br>均应由卖方负担。
d. The sellers shall be liable for any dead freight or demurrage consequent upon their failure to
have the goods ready for loading after the carrying vessel has arrived at the port of loading in
time.
戊、在货物越过船舷并从吊钩 上卸下以前,所有在搬运中发生的一切费用和风险均由卖方负
担。在货物超过船舷并从吊钩上卸下以后, 所发生的一切费用均由买方负担。
e. The Sellers shall bear all expenses and risks and risks involved in the handling of the goods
before they pass over the vessel’s rail and are released from the tackle, whereas all expenses
involved in the loading of the goods after they have passed over the vessel’s rail and have been
released from the vessel’s tackle shall be for the Buyers’ account.
(16)装运通知:SHIPPING ADVICE:
货物全部装船 后,买方应立即将合同编号、商品名称、数量、毛重、发标金额、船名
和开航日期电告买方。如单件货物 的重量超过9公吨或阔度3400超过毫米,或两旁调试2350
超过毫米,则卖方应将该件重量和尺码 告知买方。如由于卖方未及时将装运通知电告买方,
以致货物未及时保险而发生的一切损失应由卖方负担 。如货物系属危险品,卖方应将其性质
及处理办法电告买方和到货口岸中国对外贸易运输公司。
Immediately the goods are completely loaded,the Sellers Shall cable to notify the Buyers OF
the contract number ,name of commodity,quantity,gross weight,invoiced name of the carrying
vessel and the date of any package is above 9 metric tons in weight,of over 3400mmin
width,of over 2350mm on both sides in height,the Sell-ers shall advise the Buyers of the weight
and measurements of such case the goods are not insured in time oving to the Sellers
having failed to give timely advice,any and all consequent losses shall be borne by the Sellers. In
the case of dangerous goods ,the Sellers SHALL cable TO noti-fy the Buyers and the China
National Foreign Transporta-tion Corporation at the port of destination of their nature and the
method of handling then.
(17) 质量保证:CUARANTEE OF QUALITY:


卖方保证订货系用最上等的材料和头等工艺制成,全新,未曾用过,并完全符合本合同规定
的质量、 规格和性能。卖方并保证本合同订货在正确安装、正常使用和维修的情况下,自化
物到达到货口岸之日起 十二个月内运转良好。
The Sellers shall guarantee that the goods are made of best materials,with first class
workmanship,brand now,unused and correspond in all respects with the quality,specifica-tions and
perflrmance as stipulated in this sellers shallalso guarantee that the goods when
correctly mounted and properly operated and maintained,will give satisfactory performance for a
period of 12months starting from the date on which the goods arrive at the port of des-tination.
(18) 检验和索赔:INSPECTION AND CLAIMS:
甲.在交货以前,制造厂就订货的质量 、规格、性能、数量重量作出准确和全面的检验、
并出具货物和本合同规定相符的证明书,该证书为议付 托收货款而应上交银行的单据
的组成部分,但不得为货物的质量、规格、性能和数量重量的最后依据。制 造厂应将
记载试验细节和结果的书面报告附在质量证明书内。
a. The manufacturers shall before making delivery,make a precise and comprehensive
inspection of the goods as regards their quality ,specifications ,performance and
quantityweight,and issue certificates certifying that the godds are in conformity with the
stipulations of this certificates shall from an integral part of the documents
to be presented to the paying bank for negotiationcollection of payment but shall not be
considered as final in respect of quality,specifications,performance and
ulars and results of the test carried ou by the manufacturers must be
shown in a statement to be attached to the said Quality Certificate.
乙 、货物到达到货口岸后,买方应申请中国商品检验局(以下称商检局)就货物的质量、规
格和数量重量进 行初步检验。如发现到货的规格或数量重量与合同不符,除应由保险
公司或船公司负责者外,买方于货物 在到货口岸缺货后120天内凭商检局出具之检验证
书有权拒收货物或向卖方索赔。
b. After arrival of the goods at the port of destination,the Buyers shall apply to the China
Commodity inspection Bureau(hereinafter called the Bureau)for a preliminary inspection
of the goods in respect of their quality,specifications and any
discrepancies are found by the Bureau regarding the specifications or the quantityweight
or both,except those for which either the insurance company or the shipping company is
responsible,the Buyers shall,within 120 days after discharge of the goods at the port of
destination,have the right either to reject the goods or to claim against the Sellers on the
strength of the inspection certificae issued by the Buren.
丙、在合同第17条规定的保证期限内,如发现货物的质量及或规格与本 合同规定不符或发
现货物无论任何原因引起的缺陷包括内在缺陷或使用不良的原料,买方应申请商检局检
验,并有权根据商检证向卖方索赔。
c. Within the guarantee period stipulated in Clause 17 here-of should the quality and or the
specifications of the goods be found not in conformity with the contracted stipulations ,or
should the goods prove defective for any reasons,including latent defect of the use of
unsuitable naterials,the Buyers shall arrange for an inspection to be carried out by the
Bureau and have the right to claim against the Sellers on the strength of the inspection
cer-tificate issued by the Bureau.
丁.卖方收到买方索赔通知后,如果在三十天内不答复,应视为卖方同意买方提出的一
切索赔。



d. Any and all claims shall be regarded as accepted if the Sellers fail to reply within 30 days
after receipt of the Buyers’claim.
(19)索赔解决方法:SETTLEMENT OF CLAIMS:
如货物不符合本合同规定应由卖方者。同时买方按照本合同第17条和第18条的规定在
索赔期 限或质量保证期限内提出索赔,卖方在取得买方同意后,应按下列方式理赔。
In case the Sellers are liable for the discrepancies and a claim is made by the Buyers within
the period of claim or quality guaran-tee period as stipulated in Clauses 17 and 18 of
Sellers shall settle the claim upon the agreement of the Buyers in the
following ways:
甲、同意买方退货,并将通 货金额以成交原币偿还买方,并负担因退货而发生的一切直
接损失和费用,包括利息,银行费用,运费, 保险费,商检费,仓租,码头装卸费以及
为保管退货而发生的一切其它必要费用。
to the rejection of the goods and refund to the Buy- ers the value of the goods so
rejected in the same currency as contracted herein,and to bear all direct losses and expenses
in connection there with including interest accrued ,banking charges,freight ,insurance
premium,inapection charges,storage,stevedore charges and all other necessary expenses
required for he custody and protection of the rejected goods.
乙、按照货物的疵劣程度,损坏的范围和买方所遭受的损失,将货物贬值。
ate the goods according to the degree of inferiority,extent of damage and amount of
losses sustained by the Buyers.
丁、调换有瑕疵的货物 ,换货必须全新并符合本合同规定的规格、质量和性能。卖方并负担
因此而发生的一切费用和买方遭受的 一切直接损失。对换货的质量,卖方仍应按本合同
第17条的决定,保证十二个月。
e the defective goods with new ones which conform to the specifications ,quality and
performance as stipulated in this Contract ,and bear all expenses incurred to and direct losses
sustained by the Sellers shall ,at the same time,guarantee the quality of the
replacement goods for a further period of 12 months as specified in Clause 17 of this Contract.
(20)人力不可抗拒事故:FORCE MAJEURE:
由于人力不可抗拒事故,而卖方交货迟延或不能交货时,责任不在卖方。但卖方应立即
将事故通知买方 ,并于事故发生后十四天内将事故发生地政府主管机关出给的事故证明书用
空邮寄交买方为证,并取得买 方认可。在上述情况下,卖方仍负有采取一切必要措施从速交
货的责任。如果事故持续超过十个星期,买 方有权撤销本合同
The Sellers shall not be held responsible for any delay in delivery or nondelivery of the goods
due to Force r,the Sellers shall advise the Buyers immediately of such occurrence
and within fourteen days thereafter, shall send by airmail to the Buyers for their acceptance a
certifi-cate issued by the competent government authorities of the place where the accident occurs
as evidence there of . Unden such circumstances the Seellers,however,are still under the obligation
to take all necessary measures to hasten the de-livery of the case the accident lasts for
more than ten weeks,the Buyers shall have the right to cancel this contract.
(21) 迟交和罚款:LATE DELIVERY AND PENALTY:
如延迟货除人力不可抗拒事故者外,卖方应会给买方每 一星期按迟交货物总值的0。5%
的迟交罚款,不足一星期的迟交日数作为一星期计算,此项罚款总额不 超过全部迟交货物总
值的5%,在议付货款时由银行代为扣除,或由买方在付款时进行扣除。
如迟延交货超过原定期限十星期时,买方有权终止本合同。



但卖方仍应向买方缴付以上规定之罚款,不得推诿或迟延。
In case of delayed delivery,except for force majeure cases,the Sellers shall pay to the Buyers
for every week of delay a penalty mounting to 0.5% of the total value of the goods whose delivery
has been fractional part of a week is to be considered a full total amount of
penalty shall not,however,exceed5% of the total value of the goods involved in late delivery and is
to be deducted from the remount due to the Sellers by the paying bank at the time of negotiation,or
by the Buyers direct at the time of payment.
In case the period of delay exceeds 10 weels after the stipu-lated delivery date the Buyers
have the right to terminate this contract but the Sellers shall not thereby be exempted from the
payment of penalty.
(22) 仲裁ARBITRATION: 凡有关本合同或执行本合同而发生的一切争执,应通过友好协商解决。如不能解决,则
应提交中国国 际经济贸易仲裁委员会按照该会的仲裁规则在北京进行仲裁。该仲裁委员会作
出的裁决是最终的,买卖双 方均应受其拘束,任何一方不得向法院或其它机关申请变更。仲
裁费用由败诉一方承担。
All disputes in connection with this Contrace or the execu-tion there of shall be settled
throngh friendly case no settlement can be reached through negotiations,the case
should then be submitted for arbitration to China International Economic and Trade Arbitration
Commis-sion, Beijing,in accordance with its arbitration arbitration so all take place in
Benjing and binding up-on both parties; neither party shall seek recourse to a law court or other
authorities for revising the ar- bitration fee shall be borne by the losing part.
(23)附注:REMARLS:
本合同一式两份,买卖双方各执一份为证。
This Contract is made out in two original copies,one copy to be held by each party in witness
thereof
出卖人 买受人
The Sellers: The Buyers:

初二物理教案-七月初七是什么节


欧阳修简介-公司放假通知怎么写


我爱学校-建筑学课程


武汉美术网-爱不变


福建省教育考试院-儿童顺口溜


国家线2019-纪律作风心得体会


注册会计师准考证打印时间-留学助学贷款


江苏天一中学-有关元宵节的作文