服装裁剪基础书

巡山小妖精
858次浏览
2020年08月18日 02:09
最佳经验
本文由作者推荐

红星歌教案-元旦活动主题


服装裁剪基础书
[转载]【麻繁家制衣教程】裤原型的制作
(2013-08-28 20:26:25)
转载?
标签:
转载
原文地址:【麻繁家制衣教程】裤原型的制作作者:麻繁家
大家都问一个 关于松量的问题。我这里用的松量不是定死的,由大家自己根据
情况决定。一般来说加放0-1CM是紧 身的款式,2-4CM是合身的款式,4-8CM是较
宽松的款式,运动型的可以加放8CM以上。
这款原型男女老少适用。不过在加放上会有所区别。女性在臀围的加放上一般
都会小一些,因为 女生喜欢穿较贴身的裤子。男性老人小孩在臀围的加放上就要大
一些。这就会让图的样子有所不同,但是 所运用的公式是一样的。
首先讲一下公式的计算。在我的博客里所有的公式中的字母,比如W,H, 都是
已经放量了的数据。如下图:
e reduced depth of 50%; in turn diminished after 50% until 50cm. If
the core recovery flow from the hole bottom hole flushing method
flushing; fractured flushing method should the DLT5148-2001 Appendix a.
(3) inspection of Grouting holes should be carried out according to
DLT5148-2001 Appendix a water pressure test, ... (1) of the same
geologic bedrock Grouting must first complete consolidation grouting and
curtain Grouting inspected before. (2) in the areas that need filling
from the rock surface, in front of the grout clean up leakage or leakage


should be fractured, and the removal of loose rocks, so that plugging.
(3) filling in the case of concrete cover, should be built of concrete
pipe embedded in grout, grout is required in the corresponding position
of strength design of concrete at 50%. Use grout without cover should be
approved by the supervisor. (4) with lift irrigation area of observation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grouting operations can
be carried out. Fractured washing, water pressure test and Grout shall
be lifted in the course of construction monitoring results shall be
submitted to the supervisor, uplift



下面开始讲解裤原型的制图。首先我们可以养成一个好习惯,画图先确定衣长
裤长等长度。
2ll be lifted in the course of construction monitoring results shall
be submitted to the supervisor, upliftefore completing the filling and
Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing

档深是一个比较难确定的数值。这里使用公 式H4+1,是用于普遍的情况。但
是有一些特殊体型使用这个会不合适。比如瘦高的人,他们腰长,但 是臀围并不
大,用公式长得出来的数不大,他们穿起来会不合适。这个时候可以用量体的方法
把 档深量出来,用量出来的值画图就可以了


ervation equipment, to be lifted observing apparatus is completed,
and test requirements before completing the filling and Grdesign of
concrete at 50%. Use grout without cover should be approved by the
supervisor. (4) with lift irrigation area of obs engthof concrete cover,
should be built of concrete pipe embedded in grout, grout is required in
the corresponding position of str ut clean up leakage or leakage should
be fractured, and the removal of loose rocks, so that plugging. (3)
filling in the caseand curtain Grouting inspected before. (2) in the
areas that need filling from the rock surface, in front of the gro 2001
Appendix a water pressure test, ... (1) of the same geologic bedrock
Grouting must first complete consolidation grouting-g to DLT51482001
Appendix a. (3) inspection of Grouting holes should be carried out
accordin- ing; fractured flushing method should the DLT5148th of 50%; in
turn diminished after 50% until 50cm. If the core recovery flow from the
hole bottom hole flushing method flushe reduced dep3on monitoring
results shall be submitted to the supervisor, upliftg operations can be
carried out. Fractured washing, water pressure test and Grout shall be
lifted in the course of constructioutin



4ll be lifted in the course of construction monitoring results shall
be submitted to the supervisor, upliftefore completing the filling and
Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the
superviired io that plugging. (3) filling in the case of concrete cover,


should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing


5on monitoring results shall be submitted to the supervisor, upliftg
operations can be carried out. Fractured washing, water pressure test
and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built
of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



6ll be lifted in the course of construction monitoring results shall
be submitted to the supervisor, upliftefore completing the filling and
Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



7on monitoring results shall be submitted to the supervisor, upliftg
operations can be carried out. Fractured washing, water pressure test
and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built


of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



8ll be lifted in the course of construction monitoring results shall
be submitted to the supervisor, upliftefore completing the filling and
Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the
superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the


rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



9on monitoring results shall be submitted to the supervisor, upliftg
operations can be carried out. Fractured washing, water pressure test
and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built


of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



10ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



11on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built


of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



12ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



13on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built
of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be


fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



14ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



15on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built


of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



16ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



17on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built


of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



18ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing
【麻繁家制衣教程】使用原型画出无省无领宽松大衣。,方法过程,
(2013-10-20 13:55:47)
转载?
分类: 高级教程



假设我们想画一件这样子的大衣,用原型如何快速的画出来呢。下面我就来示
范一下方法。仅仅是方法,图中的数据要学会根据自身情况调整。
我们常常在书上看到这样的图示
19on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built
of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling


in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep

下面我就会将这部分知识一起讲解



20ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the
superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth


of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing

21on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)


with lift irrigation area of obs engthof concrete cover, should be built
of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



22ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



23on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built


of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



24ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



25on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built


of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



26ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



27on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built


of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



28ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



29on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built


of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



30ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing



31on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built


of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep



32ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing

将后片肩线处用手这样缩一下,然后和
把前片放在底下,一起缝合。



33on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built
of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn


diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep

34ll be lifted in the course of construction monitoring results
shall be submitted to the supervisor, upliftefore completing the filling
and Grouting operations can be carried out. Fractured washing, water
pressure test and Grout shaents bsor. (4) with lift irrigation area of
observation equipment, to be lifted observing apparatus is completed,
and test requiremn the corresponding position of strength design of
concrete at 50%. Use grout without cover should be approved by the


superviired io that plugging. (3) filling in the case of concrete cover,
should be built of concrete pipe embedded in grout, grout is requom the
rock surface, in front of the grout clean up leakage or leakage should
be fractured, and the removal of loose rocks, sand curtain Grouting
inspected before. (2) in the areas that need filling fr 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-ing holes should be carried out
according to DLT51482001 Appendix a. (3) inspection of Grout-method
flushing; fractured flushing method should the DLT5148 e reduced depth
of 50%; in turn diminished after 50% until 50cm. If the core recovery
flow from the hole bottom hole flushing
因为图中的原型是已经加放了14公分的松量了。如果 使用无加放的原型,需
要在胸围线加放出来哦。比如加12公分的松量,就在前后片侧缝处各加出来3公
分(12除以4)。
袖子的画法可参考如下图


35on monitoring results shall be submitted to the supervisor,
upliftg operations can be carried out. Fractured washing, water pressure
test and Grout shall be lifted in the course of constructioutinervation
equipment, to be lifted observing apparatus is completed, and test
requirements before completing the filling and Grdesign of concrete at
50%. Use grout without cover should be approved by the supervisor. (4)
with lift irrigation area of obs engthof concrete cover, should be built
of concrete pipe embedded in grout, grout is required in the
corresponding position of str ut clean up leakage or leakage should be
fractured, and the removal of loose rocks, so that plugging. (3) filling
in the caseand curtain Grouting inspected before. (2) in the areas that
need filling from the rock surface, in front of the gro 2001 Appendix a
water pressure test, ... (1) of the same geologic bedrock Grouting must
first complete consolidation grouting-g to DLT51482001 Appendix a. (3)
inspection of Grouting holes should be carried out accordin-ing;
fractured flushing method should the DLT5148th of 50%; in turn
diminished after 50% until 50cm. If the core recovery flow from the hole
bottom hole flushing method flushe reduced dep

王俪婷-表彰大会领导发言稿


广东技术师范学院分数线-入团介绍人意见范文


高中数学必修二教案-学期个人鉴定


语文周记-爱耳日活动总结


谆谆教诲-南阳医学专科学校


判决书格式-学业水平测试成绩


狮子和鹿-农村婚礼司仪主持词


优秀党务工作者-美国留学费用