船舶PSC检查滞留的常用缺陷处置代码含义及说明

玛丽莲梦兔
617次浏览
2020年08月18日 02:49
最佳经验
本文由作者推荐

大麦茶的好处-副班长竞选稿


船舶PSC检查滞留的常用缺陷处置代码含义及说明


表 一:
Code Actions to be Taken
代码 需采取的措施
00 No Action Taken 无不需采取措施
10 Deficiency Rectified 缺陷已纠正
12 All Deficiencies Rectified 所有缺陷已纠正
15 Rectify Deficiencies At Next Port 在下一港口纠正缺陷
16 Rectify Deficiencies Within 14 Days 在14天内纠正缺陷
17 Master Instructed to Rectify Deficiencies Before Departure 要
求船长在离港前纠正缺陷
18 Rectify Deficiencies Within 3 Months 在三个月内纠正缺陷
19 Entrance Prohibition for ship without Certification 未经认证
的船舶禁止靠港
20 Ship Delayed to Rectify Deficiencies 船舶延期离港以纠正缺陷
25 After Delay Allowed to Sail (*Specify Date) 延期后允许开航(注
明日期)
30 Ship Detained 滞留船舶
35 Detention Rised (*Specify Date) 解除滞留(注明日期)
36 Ship allowed to sail after follow-up detention 船舶再次滞留
后允许开航
40 Next Port Informed 通知下一港口
50 Flag State Consul Informed 通知船旗国领事馆
55 Flag State Consulted 咨询船旗国
60 Region State Informed 通知本区域成员国
70 Classification Society Informed 通知船级社
80 Temporary Substitution of Equipment 临时更换设备
82 Alternative equipment or method used 使用替代设备或方法
85 Investigation of Contravention of Discharge Provision (MARPOL)
违反(MARPOL)排放规定的调查
90 Letter of warning issued 签发警告信
95 Re- inspection Connection with Code 90 根据签发的警告信重新检

96 Letter of Warning Withdrawn 收回警告信
97 Destination Unknown Information 目的港信息未知
99 Other (Specify) 其他(具体说明)
表 二:
Code Meaning Actions Taken
代码 含义 需采取的措施


A
B
C
D
E
F
G
H
Detained
Rectified
Before Departure
J
K
L
M
N
O
P
Q
Grounds for detention 滞留的原因
Deficiency rectified 缺陷已纠正
Rectify the deficiency before departure
在开航前纠正缺陷
Within 14 days Rectify the deficiency within 14 days
(1)

在14天内纠正缺陷
At the next port Rectify the deficiency at the next port
(1)

在下一港口纠正缺陷
Agreed Class As in the agreed class condition
Condition 根据已同意的船级条件
Within 3 Months Rectify non- conformity in three months
(2)

在三个月内纠正缺陷
Major NC Rectify major non- conformity before
departure
(3)

开航前纠正主要不合格项
At Agreed repair port At an agreed repair port
(4)
在经允许的港口
修理
Temporary repair Temporary Repair to be carried out 进行
临时修理
Flag consulted Flag State Consulted 咨询船旗国
LOW issued Letter of Warning issued 签发警告信
LOW withdrawn Letter of Warming withdrawn 收回警告信
Operation Stoped Prohibition to continue an operation 禁
止继续操作
Temporary Substitute Temporary substitute of the equipment
临时更换设备
Other Specify unusual circumstances (free text)
说明异常情况(格式不限)

Notes:
(1)never with a detainable deficiency.
不适用与滞留性缺陷。
(2)only for ISM defective items and never with a detainable
deficiency.
仅适用于与ISM有关的缺陷项目,且不适用于滞留行
的缺陷。
(3)only for ISM defective items and always with detainable
deficiency.
仅适用于与ISM有关的、滞留性的缺陷项目。
(4)only for detainable deficiency.
仅适用于滞留性的缺陷。


船舶PSC检查滞留的常用缺陷处置代码含义及说明

挂职学习心得体会-房屋出租合同范本


红种人-仓库保管员工作总结


地球日活动-白雪公主后传


雅思写作评分标准-重阳节是几号


考核表个人总结-遵守党的政治纪律


全国三本院校-结婚主持词


泰坦尼克号经典语录-小学三年级语文下册教学计划


经典小品剧本-中央民族大学附中