Construction
decoration quality acceptance standard (for trial
implementation)
Quality and safety is the
fundamental construction enterprises. All
construction work, including brick work, plumbers,
electricians, plasterer work, woodworking etc,
and its construction process should have unified
the quality inspection of
technical standards.
Construction project manager, foreman before
process requirements, quality and technical
standard
clarification. Procedure ended, must
by project managers and related personnel, the
acceptance of the project manager
and relevant
personnel signature validation procedure, then
down a construction process. Our purpose is:
during the
construction process, control
construction quality, reduce quality accident.
Wasteful, improve efficiency and guarantee
the
benefits. Quality acceptance standard specific
implementation shall, in addition to building
materials supply quality the
reason, the
technology of construction quality by project
managers, foreman, workers level 3 is responsible,
implement
these layers, the layers of
supervision, accrual trenchant, who construction
who is in charge. Distinguish processes and
type of specific responsibility. As long as we
do specific goals, fluctuation concentric and
incentive measures scientific
and reasonable,
our cause will invincible, succeed.
A砖工:
(
a-1)基本质量要求标准:水泥与沙配比1:4;现场人工搅拌必须均匀,不得出现团状水泥。砌砖,贴瓷片,
找平,各种工作
面达到横平竖直;按照施工图纸要求,放线定位准确;与楼板安装工程,屋顶安装工程,
以及水电管线预埋工程密切配合;及时
清理建筑场地,落地沙浆即时回收利用,碎砖尽量利用。做到活完
场地清,保证工地面貌整洁。
(a-2)各种规格墙体,必须用水平尺不断校正垒砌,及时纠正错误,误差控制±0.3MM之内。
(a-3)砖缝,错落有致,坐浆丰满。砖缝灰浆厚度1cm左右。
(a-4)
配筋合理,要求4层砖配筋一层。
(a-5)盖顶板之前必须进行水平校正,每个水平面控制误差±0.5MM.
(a-6)预制过梁的设置,两头埋入墙体部分,视过梁长短保证有10~30CM.
(a-
7)露天平台,预留10CM下陷,用于做防水工程和坡度设计施工。贴面之前,必须做好防水,作7天浸水试验
,合格后,
并保护好防水层,方可进行贴面施工。不留隐患,严防积水,漏水。
(a-8)砖缝水泥沙浆要收刮整齐,及时回收利用,不得浪费材料。
A brick
workers:
(a - 1) Basic quality requirement
standard: cement and sand ratio 1:4, On-site
artificially mixing must even, may not
appear
round state cement. Bricklaying, stick ceramics,
make level, various face to horizontal flat
vertical, According to
the requirements of the
construction drawings, pay-off accurate
positioning, And the floor installation project,
roof
installation project, and hydropower
pipeline embed engineering cooperate closely with,
Timely liquidation building site,
landing
mortar instant recycling, pour as far as possible
use. Do live after site clear, ensure site look
tidy.
(a - 2) various specifications wall
decoration, must use correction unceasingly ,
timely correcting error, error control +
0.3
MM within.
(a - 3) brick joints, strewn
at random have send, sit pulp plump. Brick joints
plaster ply 1cm or so.
(a - 4) reinforcement
is reasonable, request 4 layers of bricks
reinforcement layer.
(a - 5) cover must be
carried out before the roof, each plane level
calibration error control + 0.5 MM.
(a - 6)
prefabricated lintel Settings, two embed wall body
part, depending on the lintel length guarantee a
10 ~ 30CM.
(a - 7) open platform, obligate
10CM caved in, used to make waterproofing and
slope design and construction. Cover
before,
we must complete waterproof, for seven days after
the water immersion test, qualified, and protect
the
waterproof layer, can cover the
construction. No hidden trouble, presenting
seeper, leaking.
(a - 8) brick joints to
cement mortar shall reap scrape tidy, timely
recycling, shall not waste materials.
B给排水管工:
(b-1)基本质量要求标准:给排水管道必须保证不堵,不漏,不破,耐受压力,预埋间距,高度与洁
具安装尺寸相吻合。
(b-2)凉·热水管,必须做施压试验,压力不小于自来水管网的1.5倍。
(b-3)卫生间,浴室,天台必须安装地漏去水装置,管径大于5cm。主管径不得小于110mm。
(b-4)与污水相连的地漏,必须有防臭装置。
(b-5)预埋过程中,露天管口,必须用结实纺织物或塑料布包扎好,严防堵塞。
(b-6)密切配合其他工种,做到先人一步,不耽误整体施工工期。
B drainage
pipelayer:
(b - 1) basic quality requirement
standard: water supply and drainage pipe must
guarantee not plugging, not leak, don't
break,
tolerance pressure, embed spacing, height and
sanitary installation dimensions are identical
with each other.
(b - 2) cold, hot water pipe,
must do pressure test, the tap water pipe pressure
not less than 1.5 times.
(b - 3) toilet,
bathroom, patio must be installed to water device,
floor drain pipe diameter greater than 5cm.
Competent
diameter is not less than 110mm.
(b - 4) and sewage connected floor drain, must
have deodorant device.
(b - 5) embedded
process, open-air orifice, must use strong
textiles or plastic bandage good, Defend jams,
(b - 6) closely cooperate with other kinds,
accomplish ancestors step, not to delay the whole
construction period.
C电工:
(c-1)基本质量要求:电工属特
殊工种,必须由受过专业培训,和具实际操作经验的人员实施施工,严防漏电,触电事故,使
用电料,含
电线,套管,开关,插座须符合所在国家电网和家庭用电安全质量标准。
(c-2)照明电线铜截面直
径不少于1.5平方毫米,空调及热水器,厨房不少于4平方毫米,入户主线不少于16平方毫米。
(
c-3)预埋入墙的插座底盒,离地面保持35CM高度。开关保持130CM高度。同一空间,同一水平线。
(c-4)所有电线必须套管,不得裸露。照明,插座线路分开,大于3千瓦用电设备须设独立回路控制
。一回路并联不超过5个
插座。入户开关控制箱必须根据回路数量,用电负荷设置相应空气开关及漏电保
护开关。施工完毕,必须绘制现场详细布置线
路图。交公司和业主备案。
(c-5)所有电线接口,最好实施锡焊,防止发热,绝缘严密,有相当防水作用。
(c-6)电路交付使用之前,或者埋闭之前都必须做短路,漏电试验,合格后才能进入下一道程序。
(c-7)充分考虑图纸和业主使用要求,预埋线路到位,具整体概念。
(c-8)灯具及开关插座安装,要求整齐,美观,水平一致。
C
electrician:
(c - 1) basic quality
requirements: electrician of special crafts, must
by well-trained, and a practical operation
experience the persons with regard to leakage,
construction, use dianliao, electric shock
accidents, casing, containing
wires in
switches, sockets shall conform to state grid and
family electricity safety and quality standards.
(c - 2) lighting copper wire section diameter
not less than 1.5 square millimeter, air
conditioning and water heater, the
kitchen is
not less than 4 square millimeter, enter a
mainline not less than 16 square millimeter.
(c - 3) embedded into the wall bottom box,
from the ground, and keep 35CM high. Switch to
keep 130CM
height. Same space, the same level.
c - 4) all wires must casing, shall not
be naked. Lighting, socket line separate, more
than 3 kw electrical equipment
must be an
independent loop control. Once road parallel no
more than five sockets. Enter a switch control box
must
according to loop quantity, electrical
load switch and set up corresponding air leakage
protection switch. Construction
finished, must
draw site detailed layout route map. Hand in the
company and client record
(c - 5) all wires
interface, best implementation soldering, prevent
heat insulation tight, have quite waterproof
function.
(c - 6) circuit consign is used, or
buried close before must do a short circuit,
leakage test, the ability after certificate into
next program.
(c - 7) fully consider the
drawings and owner use requirement, embed lines in
place, with the overall concept.
(c - 8) lamps
and lanterns and switch socket installation, ask
neat, beautiful, level consistent.
D抹灰工:
(d-1)基本质量标准:阴阳角拉直,表面平整,无开裂,脱落现象。
(d-2)河沙有粗粒者,必须过筛,墙面淋湿,才能进行施工。
(d-3)抹灰之前,清扫干净场地,落地剩余沙浆及时回收利用,杜绝材料浪费。
(d-4)重点拉直阴角,阳角,如遇墙体变形,则必须做水平拉直。
(d-5)在灰浆收干之前,作压光处理。
(d-6)刮大白参考此施工标准。
D
plasterer workers:
(d - 1) basic quality
standard: pull straight, Recessed 90 degree Angle,
prominent 90 degree Angle, without craze, falls
off phenomenon.
(d - 2) river sand have
coarse grained, who must sift, metope to get wet,
to construction.
(d - 3) plastering, cleaning
the clean before landing site, residual mortar
timely material waste recycling, eliminate.
(d
- 4) key straight Yin Angle, Yang Angle, such as
the case of wall deformation, criterion must do
level straight.
(d - 5) in charge dry mortar,
before be pressure light processing.
(d - 6)
blow out the construction standard reference.
E木工:
(e-1)基本质量标准:吊顶,门,橱柜,衣柜,以及其他木作工程,都必须接缝
严密,边角光滑,表面平滑,收口美观,安装
科学合理。
(e-2)吊顶之前必须水平校准,误差小于±0.3MM.
(e-3)门框固定四周横平竖
直,门叶安装之前,先进行预装,视情况进行加工,四周留缝不大于0.3MM.
(e-4)橱柜,衣柜安装,柜门垂直,铰链运动自如,门缝不能大于0.3MM。
(e-5)角线,含石膏线,木线。要求碰角美观,水平,成直线。不开裂,脱落。
E
carpenter:
(e - 1) basic quality standard:
condole supports, door, ambry, wardrobe, and other
wood to make project, must
juncture rigor,
edge horn is smooth, surface smooth, beautiful,
varietal installation scientific and reasonable.
(e - 2) condole is necessary before level
calibration, an error less than 0.3 mm.
(e -
3) doorcase fixed around the flat vertical, door
leaf prior to installation, first conducts
preinstalled, depending on the
situation to
carry on the processing, around seam no greater
than 0.3mm.
(e - 4) ambry, wardrobe
installation, cupboard door vertical movement,
crack, hinge not greater than 0.3 mm.
(e - 5)
horny line, including gesso line, wooden line.
Request touch Angle is beautiful, level, into a
straight line. Not
craze, fall off.
F:涉及屋顶
安装工程,门窗安装工程,家具橱柜安装工程,扶手梯步安装工程,绿化园林工程,泳池建造安装工程等单独外包
安装工程,具体质量验收标准,由公司签订的承包合同具体约定,如没有条款约定,则按惯例,或行业行
规标准执行。工程承
包方必须履行合同规定的质量验收标准。或行业质量验收标准。
F:
involves roof installation project, doors and
Windows installation project, furniture ambry
installation project, armrest
ladder
pace installation project, greening garden
engineering, construction installation engineering
pool alone
outsourcing installation project,
specific quality acceptance criteria, by a company
to sign the contract, if not
specifically
agreed terms agreed, are traditionally, or
industry stock-in-trade standards implementation.
Engineering
contractor must perform the
quality inspection of standard stipulated in the
contract. Or industry quality acceptance
standard.
G:瓷砖工,路砖工
(g-1)基本质量标准。完成的砖面平
整,无破损!留缝整齐统一,砖角水平,严禁翘角!釉面瓷砖碰角须切成半直角。
(g-2)阳台瓷片铺贴须形成最佳走水斜面。严禁产生积水洼池!
(g-3)铺贴完毕,及时清理留缝,砖面清洁,做好成品保护,防止变形,人为损坏。
(g-4)开切瓷片,须熟练师傅操作,杜绝不必要的损耗。
(g-5)铺贴瓷砖,沙浆必须密实,不得空鼓。
(g-6)铺贴瓷砖之前,须找出水平准线,拉好横直准线。排好砖的位置。
(g-7)路砖铺贴,主要夯实基础,造型流畅,走水流畅。
G: ceramic
tile work, road brick work
(g - 1) basic
quality standards. Finished brick surface smooth,
without damage! Stay seaming tidy uniform, brick
horn
level, forbidden ! Glaze Strictly cock
Angle ,ceramic tile touch Angle must be cut into
45
degree.
(g-2) balcony red-tiled
shop sticks must form optimal applied cant.
Strictly produce product
Low-lying pool!
(g - 3) the shop is stuck finished, timely
liquidation seam, bricky surface cleaning,
completes the product protection,
prevent
deformation, artificial damage.
(g - 4)
starting cut ceramics, must skillfully master
operation, eliminate needless loss.
(g - 5)
shop sticks ceramic tile, mortar must be close-
grained, not empty drum.
(g - 6) before shop
sticks ceramic tile, must find level alignment,
pull with alignment. A row brick position.
(g
- 7), the main road paved tiles with solid
foundation, smooth shape, applied fluent.
H:油漆工
(h-1)基本质量标准,基面打磨,修补平整,漆膜均匀,平滑。无明显色差,分色部位整齐。 (h-2)油漆施工过程中,不得污染其他工程成品:如门窗成品等。施工之前做好贴膜保护工作。完工清理
保护膜,清洁工作
面,场地。
(h-3)南非气候干燥,油漆使用后及时加盖!防止水分挥发,发生硬化变质。
(h-4)滚筒,刷子须及时清洗残留油漆。以便重复使用。
H: painter
(h - 1) basic quality standards, cherub face
burnish, repair the level off, uniform varnish
film, smooth. No clear off color,
dichroic
parts neatly.
(h - 2) paint construction
process, not to pollute the other engineering
products: such as doors and Windows products,
etc. Construction before do laoding protection
work. clean
Completion of clear protective
film, clean worksite.
(h - 3) South Africa dry
climate, paint after use timely affixed with!
Prevent moisture volatilizes, produce sclerosis
metamorphism.
(h - 4) drum, shall timely
cleaning brush paint residue. In order to use
again.
I:泳池工程
(i-1)基本质量标准,不漏,不渗,不裂。泳池表面光滑。预埋管道科学合理。
(i-2)必须做好提前预埋灯饰电路,进水和出水管道工作。
I: pool
engineering
(I - 1) basic quality standard,
not leak, not permeability, no crack. Pool smooth
surface. Embed pipe scientific and
reasonable.
(I - 2) must be done well in advance, water
and embed lighting circuit effluent conduit work.
J:种草绿化
(j-1)基本质量标准,草与土地密切接触,确保草苗存活。
(j-2)种草之前,做好土地的平整,疏松。
(j-3)压实草地,及时淋水。
J: grass greening
(j - 1) basic quality
standards, grass and land intimate contact, ensure
grass seedlings live.
(j - 2) grass land
leveling, well before, osteoporosis.
(j - 3)
compaction grass, timely drench water.
K:以上工程施工质量标准,只是基本标准要求,如有特殊要求或其他罗列不尽之处
,请询问相关工程技术人员或参考相关技术
文献.谢谢合作!
K: the above
project construction quality standards, just basic
standard requirement, if you have special request,
or
other listing not place, please ask related
engineering and technical personnel or reference
related technical literature.
Thank you for
your cooperation!
L:质量事故处理原则:谁施工谁负责,谁受益谁负
责。如直接责任人,故意违反质量技术,工艺,工序要求,偷工减料,造
成质量事故,导致工期,人工,
材料损失,必须由直接责任人负责。希望各位时刻警醒,铭记:“安全第一,质量第一”的施
工方针。知
照执行。
L: quality accident treatment principle:
who construction who is responsible, who benefited
who is in charge. Such as
direct owner,
intentionally violates quality technology, craft,
process requirements, jerry, create quality
accident,
resulting in the construction
period, labor, materials, it must be made directly
responsible loss is responsible. Hope
everybody vigilant, remember:
上述文字,各工长,项目经
理,承包工程公司及本公司相关管理人员必须认真领会并签字确认,张贴于施
工项目的显眼处,时刻起到
警示和落实的作用。 above text, each section, the project
manager,
contracting engineering companies and
the company related management must be
meticulously
understand and signed
confirmation, posted on construction project of
prominent place, always a
warning signal and
carry out the role.
1)砖工:
(签名确认,下同)
2)给排水工:
3)电工:
4)木工:
5)抹灰工:
) brick workers: (signed
confirmation, similarly hereinafter)
2) water
supply and drainage workers:
3) electrician:
4) carpenter:
5) plasterer workers:
6)瓷砖工:
7)油漆工:
8)泳池工:
9)种草工:
10)项目经理: 现场工人总工长:
6) ceramic
tile workers:
7) : painter
8) pool
workers:
9) grass workers:
10) project
manager:
the worker total foreman:
12)本公司领导:
JADE AFRICA(ormonde)(工程部)
13-11-2010
2) the company leadership:
JADE AFRICA (ormonde) (engineering)